Big Rack Shuttle - National Trails Day

Heber Trail Day – 22 Strong

Date Posted:
Tags: , , , ,

For the 1st trail day of the season, we came in force with 22 volunteers strong.

The work was performed under Wasatch Trails Alliance on the Riverview / Coyote trails in Heber, Utah. The day’s work consisted of a 6mile long stretch of newly built called Chopped Coyote, the trail needed some spring time buffing. Cutting a couple downed trees, trimming back branches, lightly armoring up some berms and “sweeping” the trail clean.

Big thanks to Big Rack Shuttle for donating 2 shuttles to help expedite our travel to the work site, and allowing us to enjoy of little of the backside Coyote Loop on the way in (riding Coyote was a first for most of the crew).

Thanks to NAAWK for helping to keep all our volunteers sunburn free.

As an added incentive, all racers received a 50pt bump to their series standings.

Big Rack Shuttle - National Trails Day moving a downed tree IMG_5403 Chopped Coyote Looking Smooth Not a Bad View